New Giza University
Year : 2015
In Phase # 1 of New Giza University TECO was Selected by the Client among other Competitors to be the ELV Contractor for Buildings (A), (B), and Utility Building Where TECO executed the first fix, Second Fix and Third fix for Structured Cabling, Fire Alarm, Sound System, and Master Clock System. After Client’s selection TECO was the ELV nominated contractor to EL – OFOQ. TECO spent a lot of efforts to catch up with the project schedule specially the selection of TECO was made after most of construction works were done
In Phase # 2 of New Giza University, although TECO did not participate as ELV Contractor, El – OFOQ who was awarded other two buildings in the university selected TECO to be the supplier of the Fire Alarm System and do the connection with the fire alarm system in phase # 1
| Main Contractor: Al Rowad MEP Contractor:El – OfOQ
|
|
|
| TECO Scope of Work
complete with Networks and all related first fix (Conduits, Cable Trunks, Back boxes) | | |
NGU External View Structured Cabling Racks Main Fire Alarm Control Pane NGU – Slave Clocks in corridors and Public Areas NGU – Public Address Racks NGU – Main Entrance Hall NGU – Lecture Hall NGU – Class Room NGU – Waiting Area NGU – Corridor |
|